Butch Hill Pump Station
Client: Lafourche Parish Government
Contact: Dillion Baronne, PLS, Director of Public Works
Location: Raceland, Louisiana
Project Cost: $1,750,000
Complete: In Progress
​​
Lafourche Parish Government will replace the existing Butch Hill Pump Station and adjacent Twin Oaks Pump Station with a larger 1,200 cfs capacity drainage pump station. The new Butch Hill pump station will house a total of eight (8) vertical line shaft pumps which will be driven by both diesel engines and electric motors. Two diesel generators will be installed as a backup to the electric motors in case of a power outage. The drives for the pumps will be located inside a two-story building to provide weather protection to the equipment and personnel while doing routine maintenance.
YKH Consulting provided electrical/mechanical design services for the new 1,200 CFS pump station. YKH assisted GIS with the
design and will provide bidding and management of construction on TPCG's behalf. YKH will also provide construction management services inclusive of construction administration and construction inspections.